Independent ERP solution design review
Put a second pair of senior eyes on the solution design before it becomes configuration, code and cost. By stress-testing the ERP architecture, customisation decisions and integration patterns against your requirements, you sign off a design you understand while change is still in budget.
Design flaws are cheap to fix now and expensive to fix later
A wrong subsidiary structure, an over-customised process or a missed integration constraint costs a workshop to fix on paper. In a live system it costs a remediation project. The design stage is the only moment when changing your mind is nearly free, and it is exactly the moment when most clients cannot judge what they are signing.
What we examine
- ArchitectureSubsidiaries, segments and the data model are the near-permanent decisions, so we stress-test them first.
- Customisation callsEvery proposed script is challenged with one question: does standard NetSuite already do this?
- Integration designWe review integration patterns, error handling and ownership, because those are the places where integrations fail later.
- Fit to requirementsWe test whether the design solves your stated problems rather than a template of them.
- ScalabilityWe check that next year’s volumes and entities fit without a rebuild.
- The gapsWe identify what the design is silent on, which is usually the most expensive part.
Want an independent solution design review?
Talk through where your implementation stands with a senior consultant. It’s free, it takes 30 minutes and there’s no sales pitch.
What the review buys you
Mistakes caught on paper
Design errors are corrected at workshop cost rather than project cost.
Customisation debt avoided
Every challenged script that becomes standard configuration saves money for the life of the system.
A design you understand
You sign knowing exactly what you are signing, because the review explains the design in plain terms.
Confidence, either way
A validated design is worth as much as a corrected one.
How it runs
Documents in – you send us the design pack, the requirements and any solution decisions made to date.
Review – a senior NetSuite solution architect works the design against your requirements and NetSuite standards, in about a week.
Challenge session – findings are walked through with you, and with the partner if you choose.
Written outcome – you receive the validated points, the risks and the recommended changes, yours to enforce.
What to know before you start
- !We review the design that exists. If documentation is thin, that is the first finding. A design that exists only as undocumented intentions cannot be reviewed, signed or held to.
- !Expect professional disagreement. Good partners defend their choices. The session is a technical argument made on your behalf, and the best outcome is a better design that either side could claim.
- !Our changes are recommendations. You and your partner decide what is adopted. We will tell you which recommendations are worth insisting on.
- !Timing matters more than duration. The review lands best after the design is documented and before build starts in earnest. Booked then, it takes days and changes little except the design. Left until later, the same problems still surface – but by then fixing them means paid change orders and rework.
ERP Solution Design Review FAQs
When should the design review happen?
Can you review a design from any partner?
What if you find the design is fine?
Last reviewed: 12 October 2026 · Written by the Suite Generation team
Suite Generation is an independent, senior-led NetSuite consultancy. Every project is designed and delivered by consultants at or close to solution-architect level. We don’t resell licences or carry partner targets. Our advice is ours, whether you’re implementing NetSuite, rescuing a stalled project or fixing a system that never delivered.
